Q#1: a : Your team is asked to develop criticalsoftware of health insurance system, as the project is complex andsensitive related to theInsurance of health so there is no chanceof error. If the size of the project is 33200LOC then calculate the“Effort”in person month, and“Time” required to develop (Schedule)the Software in months, with the number of people required tocomplete the project using“OrganicDevelopmentMode”.[15]

Given below are the formulae to calculate the Timerequired for project schedule.Organic:T = 2.5 x (Effort).38

Formula to calculate the number of peopleis…

Total numberof people needed= Effort / Total time todevelop

Given below are the formulae to calculate the Timerequired for project schedule.

Organic:

T = 2.5 x (Effort).38

b: Write down the characteristics of highqualityWBS.[10]c: Draw the figure about when the preparation ofthe SRS document can begin.[5]